Sterling Equipment is prepared to handle your Bulk Shipping and Mobilization needs.  Our yard is perfectly situated for cargoes bound for, or loading out of, the Greater Boston Metropolitan Region.  Your Cargo can be brought in or shipped out by rail, truck or barge.  Our facility meets all MTSA requirements and has a USCG approved Facility Security Plan.  If you need to mobilize equipment on or off of barges, ours is the perfect location for that as well.

Our pier location: Boston Harbor Chart 13270 - 42.24271 N 070.97041 W
Pier Length: 900’ x 50’
30’ depth at MLW

Built in RoRo ramp shore end
3 Acres of Laydown space.
In house work force, Heavy Lift Cranes up to 300 Tons available and material handling equipment on site.
Rail Access via Fore River Transportation to the main CSX line.
Close Proximity to major highways: I-95, I-93, SR 3, SR 128.
Fore River Bridge: 173’ Horizontal Clearance, 173’ Vertical Clearance

 

Unloading  Salt

 

 

RoRo Ramp at the Pier Head

 

 

Offloading Structural Steel